# Commissioning with OPR, BOD (LEED, ASHRAE G0, Std 202)

## Overview: commissioning with OPR and BOD

Commissioning with **OPR** and **BOD** in the Commissioning tools lets you structure requirements, design responses, reviews, assets, tests, reports, and issues, which is used for projects that follow **LEED**, **ASHRAE Guideline 0**, or **ASHRAE Standard 202**.

* Your role must be high enough to create projects and change project settings (typically **Manager** or **Admin**).
* You can find the menu at **Project Settings** - **Tools and Modules** - **Commissioning Block**.
* This enables commissioning tools and changes OPR, BOD, reviews, assets, checklists, reports, and issues for the project.

## How to set up commissioning with OPR and BOD

1. Go to **Projects**.
2. Create a new **Asset Based Project**.
3. Enter a project name and continue.
4. Select the project type and checklist types, for example **PFC** and **FPT**.
5. Add the required asset types and quantities.
6. Open **Project Settings**.
7. Go to **Tools and Modules**.
8. Enable **Commissioning Block**.
9. Go to **Commissioning** in project settings.
10. Enable the commissioning tools you need.
11. Add or import your **OPR** requirements.
12. Use **BOD** to collect designer responses and approve, reject, or postpone them.
13. Use **Reviews** to upload drawings or documents and create markup comments.
14. Attach checklist templates to your asset types.
15. Enable **Reports** if you need commissioning reports or final documentation.

### Video guide

${frame}[Tutorial: Commissioning with OPR, BOD (LEED, ASHRAE G0, Std 202)](https://www.loom.com/embed/ecb3130fa6b6453da67bfb692520e203)

## Results: commissioning tools and workflows

| Tool | Purpose |
|---|---|
| Organization Chart | Project users, groups, interfaces, and communication lines |
| OPR | Project requirements that must be verified |
| BOD | Designer or consultant responses to OPR items |
| Reviews | Document upload, drawing review, markups, and comments |
| Assets | Project assets and attached checklist structures |
| Reports | Commissioning documentation combining text, images, and files |
| Issues | OPR, review, and test-related issues in one log |

| Step | Result |
|---|---|
| OPR item is created | Requirement appears in the OPR list |
| BOD is opened | OPR items are mirrored into BOD |
| Designer adds a response | Response returns for commissioning review |
| Commissioning team rejects response | Comment is required and the item returns to the designer |
| Commissioning team approves response | BOD item is marked approved |

## Troubleshooting: OPR and BOD commissioning

| Problem | Cause | Solution |
|---|---|---|
| Commissioning tools are not visible | Commissioning Block is not enabled | Enable **Commissioning Block** under **Project Settings** - **Tools and Modules** |
| BOD is empty | No OPR items exist yet | Add or import OPR requirements first |
| Designer cannot approve or reject BOD items | Approval actions belong to the commissioning team | Ask the designer to add or update the BOD response only |
| Assets do not show checklists | Checklist templates are not attached | Attach templates to the relevant asset types |
| Reports are not visible | Reports module is not enabled | Enable **Reports** under **Tools and Modules** |