Set up a Timeline and Schedule for Data Centers in the Asset Module
Overview: data center schedule and timeline
Asset module scheduling lets you assign start and end dates to checklists across levels, import dates from Excel, and manage the plan in a Gantt timeline, which is used for Level 2-5 data center test sequences.
Assets and checklists must already exist before you plan dates.
- Your role must be Manager or higher.
- You can find the menu at Assets - date columns, or menu - Gantt Timeline.
- This changes checklist dates, Gantt bars, and dependency links. Folder-level date changes affect all underlying checklists.
How to schedule data center checklists
Video guide
Plan checklists directly in the asset view
- Go to your project and open Assets.
- Select an asset, for example ATS.
- In the Start date and End date columns, select a date in the grey row for a level, for example Level 3.
- Confirm CxPlanner assigns dates to all underlying checklists.
Plan one checklist at a time
- Click the start date for a specific checklist.
- Select a date.
- Repeat for the end date.
Import plan from Excel
- Go to Asset Overview and click Options.
- Select Import.
- Upload your Excel file with dates.
Use the Gantt timeline
- Open the menu and select Gantt Timeline.
- Expand the levels or folders to view planned checklists.
- Drag bars to adjust dates.
- Move entire folders to update all underlying activities.
- Adjust individual checklists as needed.
Create dependencies
- Select a checklist.
- Define a dependency to another checklist.
- Use an end-to-start relationship.
Results: data center schedule
Method | Description |
|---|---|
Bulk via level | Assigns dates to all checklists under a level |
Manual | Sets dates one by one |
Excel import | Imports the plan in bulk from a spreadsheet |
Gantt drag-and-drop | Visual planning and adjustment |
Dependency | Description |
|---|---|
End-to-start | A checklist starts when another one finishes |
One-to-one | Only one checklist can be linked to another |
Level dependency | Entire levels depend on each other (recommended) |
Status | Display in Gantt |
|---|---|
Approved | Green |
Failed | Red |
Planned | Default color |
Troubleshooting: data center schedule
Problem | Cause | Solution |
|---|---|---|
Dates are not updated correctly | Wrong level or row selected | Select the grey level row for the correct level, then set dates again |
Plan changes unintentionally | A folder was moved in Gantt | Undo by editing individual checklists, or move only the intended folder |
Plan is too complex | Too many checklist-level dependencies | Prefer level dependencies instead of many one-to-one links |
Gantt does not show all data | Levels or folders are collapsed | Expand folders in the Gantt view |