Articles on: Reporting & Analytics

Real-Time Project Data with Dashboard Analytics

Overview


How do I use the dashboard analytics to track project progress in CxPlanner?


The Analytics module in CxPlanner allows you to track checklist progress, quality assurance status, and test outcomes through a filterable grid view and visual dashboard charts, which is used for project health monitoring, progress reporting, and coordination meetings.


This guide covers accessing and using both views of the Analytics module - the Assets: Checklist grid and the Dashboards tab - including filtering, customizing grid columns, and saving filter presets. Requires project role Manager or Admin to access the module.


Only users with the project role Manager or Admin can access this module (if activated for the project).


A full video walkthrough is included below in Behavior and results.



When and why to use this


Use the Analytics module when you need to review checklist progress or produce a status report for a project team, client, or general contractor. The module offers two complementary views: the Assets: Checklist grid for detailed, line-level review, and the Dashboards tab for a high-level visual summary suited to progress meetings.


  • When this action is needed - during weekly project reviews, coordination meetings, or when a client requests a snapshot of checklist and QA completion status
  • What the system does - the grid lists individual checklists with filterable status data, while the Dashboards tab renders donut charts, timelines, and grouped breakdowns of that same underlying data
  • Limitations - the module must be enabled per project by a Manager or Admin before either view becomes visible in the sidebar


Steps to access dashboard analytics:


  1. Go to the sidebar and click on Analytics. (If you don’t see it, the module may not be enabled for the project.)
  2. Select the data area you want to explore (e.g., Assets, Tasks, QA, Test results).
  3. Apply filters from the filter bar - Name, Status, Category, Responsible person, Responsible company, Checklist Types, Asset Types, or Assets fields. Combine multiple filters as needed; the grid updates immediately.
  4. Review graphs and tables to understand status and trends.
  5. After applying the filters you want, click Save filter and enter a name to save the combination as a preset.
  6. In the Dashboards tab, review the five chart panels: Checklist approval progress, Approval stats breakdown, Checklist line items stats, Checklist timeline, and Checklist assignments.
  7. On the Checklist timeline panel, use the chart type selector to switch between Planned vs Actual, Planned vs Actual Accumulated, Line Items Approved Over Time, and Approved Checklists Over Time.
  8. On the Checklist assignments panel, use the grouping selector to switch between Category, Company, Responsible person, and User group.


Analytics overview



Behavior and results


The dashboard provides visual overviews of project areas like:

  • Task progress (e.g., completed this week)
  • QA statuses (e.g., failed checklists or pending approvals)
  • System-specific performance (e.g., ventilation test failures)


Filters allow custom reporting by:

  • Time range (e.g., yesterday, last 7 days)
  • System type
  • Category or responsible person


Each project must manually activate the Analytics module to make it accessible



Assets: Checklist grid


The default view lists all checklists in the project as a filterable table. Columns include Name, Status, Category, Responsible person, Responsible company, Asset, and others available through Edit grid. Column visibility changes apply only to your own session and do not affect other users' views.


Dashboards tab


Chart

Type

What it shows

Checklist approval progress

Donut chart

Split of approved, pending, and not-started checklists as a percentage of total

Approval stats breakdown

Numerical summary

Count of checklists in each approval status

Checklist line items stats

Summary table

Total line items across all checklists, broken down by approved, pending, and N/A

Checklist timeline

Line or bar chart

Checklist progress over time, with four selectable chart types

Checklist assignments

Grouped bar or table

Checklist status grouped by category, company, responsible person, or user group



The dashboard also surfaces system-specific performance data, such as ventilation test failures, and supports custom reporting by time range, system type, category, or responsible person.


Filter presets


Saved filter presets are not user-specific. Once saved via Save filter, a preset appears in the filter dropdown for every project user - not just the person who created it. Any user with access to the Analytics module can save a preset; there is no additional role restriction beyond module-level access.


Saved filter presets are visible to all project users, not just the person who created them.


Permission summary


Action

Required role

View Analytics module (both tabs)

Manager or Admin

Save a filter preset

Manager or Admin (same as module access - no additional restriction)

Edit grid columns

Manager or Admin (session-only, no additional restriction)


Video guide


Watch a full demonstration of the Analytics module here:



Troubleshooting


Problem

Cause

Solution

Can't see the Analytics menu

Module not activated for the project

Ask a Manager or Admin to enable it

No data appearing in results

Filters too narrow

Reset or broaden filters

Saved filter preset isn't visible to teammates

Preset wasn't saved successfully, or the page needs a refresh

Reapply the filters, click Save filter again, and confirm the preset appears in the dropdown before sharing

Dashboard charts don't reflect recent changes

Checklist updates haven't fully saved, or the page is cached

Refresh the Dashboards tab and confirm the underlying checklist change was saved first

Edit grid column selection resets

Column visibility is session-only and doesn't persist across logins

Reapply the desired columns via Edit grid each session

Assets fields filter is missing or empty

The project has no custom asset attributes configured

Ask a project Admin to confirm asset attribute setup


Quick facts

  • Requires: Project role Manager or Admin to access the module; no additional role is needed to save filter presets or customize grid columns beyond that
  • Location: Sidebar → Analytics → Assets: Checklist tab (grid) and Dashboards tab (charts)
  • Affects: Task and checklist visibility, QA tracking, reporting, and saved filter presets (visible to all project users)

Updated on: 07/08/2026

Was this article helpful?

Share your feedback

Cancel

Thank you!