Import and Update assets from Excel (CSV)
Overview
How do I import or update assets in a project in CxPlanner?
CxPlanner lets you import new assets in bulk or update existing ones through export, editing, and re-import. This streamlines project setup and ongoing asset management.
When and why to use this
- Import new assets when starting a project or adding a large batch of equipment or components.
- Update existing assets when you need to make bulk changes to data already in the system.
- The system automatically assigns tags and categorizes assets based on your input.
- Ensure the CSV delimiter setting matches your location (comma for US, semicolon for Europe/Asia).
How to add 1 new assets
- Open your project in CxPlanner
Navigate to your project from the dashboard.
- Go to the Asset Overview
Click Asset Overview in the sidebar.
- Generate a unique tag
Create a unique tag before adding assets.
- Select the asset type
Choose from the available types (e.g., ATS, BMS, Chiller, etc.).
How to import many new assets
- Download the import template
The CSV file will include main details (SELECT: comma for US
, semicolon for Europe/Asia
)
- Download the import template.
Fill in the required data: Tag + Asset type. Remember that the Asset type must be from the list.
- Upload the file
Use the upload option in the Asset Overview to complete the import.
How to update existing assets
- Export current asset data
Go to Asset Overview and download the current asset list as a CSV.
- Edit the CSV file
- Make the necessary changes (e.g., update names, statuses, or other attributes).
- Ensure you keep the original asset IDs intact so CxPlanner can match them.
- Re-import the updated file
Upload the edited CSV into Asset Overview to apply changes in bulk.
- Review the updates
Verify that all changes have been applied correctly.
Video guide
Behavior and results
- Importing new assets adds new records with your chosen type and generated tag.
- Updating existing assets replaces specific data fields without changing the asset ID.
- Bulk update is available after either import or update for further mass changes.
Permission matrix
Role | Can Import Assets | Can Update Assets |
---|---|---|
Admin | Yes | Yes |
Manager | Yes | Yes |
Consultant | No | No |
Designer | No | No |
Contractor | No | No |
Viewer | No | No |
Troubleshooting
Problem | Cause | Solution |
---|---|---|
CSV not uploading | Incorrect delimiter setting | Adjust delimiter to match your location |
Missing asset data | Template not completed correctly | Re-download template and fill in all fields |
Can't access Asset Overview | Insufficient project role | Contact project admin for access |
Duplicate tags | Tag already exists in project | Generate a new unique tag |
Updates not applied | Asset IDs changed or removed in CSV | Keep original IDs intact in the file |
Quick facts
- Requires: Project role Manager or higher
- Location: Project → Asset Overview
- Affects: Asset list, bulk updates, reporting
- Supports bulk import: Yes
- Supports bulk update: Yes (via export and re-import)
- File format: CSV with correct delimiter settings
Updated on: 08/15/2025