Tutorial: Creating and managing an Asset-based project

Overview


How do I create and manage an asset project in CxPlanner?


Asset projects in CxPlanner allow you to structure, track, and manage all assets across a commissioning or construction project. This includes setting up the project, importing assets, defining asset types, creating checklists, and tracking issues.


Only users with the project role Manager or higher can create and manage asset projects.



Video guide: Creating and managing an Asset-based project




How to - step by step


1. Create a New Project


  • Open CxPlanner.
  • Select an existing project or click Create Project and name it (e.g., Asset Quick).
  • Click Next to proceed.


2. Select Project Type


  • Choose Construction as the project type.
  • Select the default checklist types (can be changed later).


3. Define Asset Types


  • Review the suggested asset types.
  • Add new types now or at any time later.


4. Finalize Project Creation


  • Click Create Project to complete the setup.


5. Access the Asset Overview


  • Go to Assets → Overview to view all registered assets.


6. Manage Checklist Types


  • Review existing checklist types.
  • Add or modify checklist types as needed


7. Add Assets Manually


  • Click Add Asset.
  • Enter the required details: CCMS Tag and Asset Type.
  • Repeat for all assets.


8. Import Assets via CSV


  • Prepare an Excel CSV file with asset data.
  • Use the Import function to bulk upload assets.


9. Update Asset Attributes


  • Click on an asset to open its details.
  • Update fields and attributes as required.



10. Use the Global Test View


  • Access Global Test View for a comprehensive overview of all tests and related assets.


11. Approve Checklists


  • Review checklist items.
  • Approve and save the checklist.


12. Handle Checklist Issues


  • Review issues generated from checklists.
  • Update the issue status as required.


13. Track Issues Globally


  • Use the Global Issue List to monitor and manage all open issues.



Behavior and results


  • All assets are linked to checklists, test results, and issues.
  • The system automatically updates asset records when checklists are approved or issues are resolved.
  • You can filter, export, and report on asset data at any point.


Permission matrix


Action

Required Project Role

Create asset project

Manager or higher

Import assets (CSV)

Manager or higher

Edit asset attributes

Manager or higher

Approve checklists

Consultant or higher

Track issues

Viewer or higher



Troubleshooting


Problem

Cause

Solution

Cannot create project

Insufficient permissions

Contact a project Manager or Admin

Asset import fails

Missing required fields

Verify CSV headers and mandatory columns

Checklist not visible

No checklist type selected

Add checklist types under project settings

Issues not appearing in overview

Filters applied or incorrect status

Reset filters or check issue assignment



Quick facts


  • Requires: Project role Manager or higher
  • Location: Assets → Projects
  • Affects: Checklists, Global Test View, Issues, PDF reports


Updated on: 09/29/2025