How do I import my existing checklists or test sheets into CxPlanner?
You can easily transfer your current Excel-based checklists into CxPlanner using the built-in Import from XLSX function. This ensures your project workflows stay consistent without needing to rebuild everything from scratch.
When and why to use this
Importing from Excel is useful when you already have structured checklists or test sheets and want to bring them into CxPlanner.
- Use this feature when you want to migrate checklists quickly from spreadsheets.
- The import tool automatically converts your Excel data into CxPlanner’s structure.
- You can choose between a simple import (minimal required fields) and an advanced import (with detailed requirements and options).
- Some fields are optional but allow you to add rules such as photo requirements or mandatory comments.
How to - step by step
- Open your template and click the Import from XLSX (Excel) button.
- In the popup window, click Download template.
- Open the downloaded template and copy your data into the file.
- At minimum, fill in Topic/Heading and Test item.
- Copy the result from the green column on the right-hand side.
- Back in CxPlanner, paste the copied values into the import field.
- Click Import data to complete the process.
Step 1
Step 2 & 3
Step 4 & 5
Behavior and results
Simple vs. Advanced import
CxPlanner offers two levels of importing:
Simple import
Minimal fields required. Best if you only need basic checklists.
Advanced import
Full control over checklist behavior and validation.
Field definitions
Field type | Purpose |
---|---|
(1) Required fields | Defines the checklist topic and item descriptions. |
(2) Optional fields | Adds extra information, e.g., reference notes. |
(3) Comment on fail | Requires users to write a comment if they fail an item (set with “X”). |
(4) Required input | Defines required actions, e.g., upload a photo (set with “X”). |
(5) Advanced options | Allows configuration of additional behaviors. |
(6) Copy/Paste column | The generated green column to paste back into CxPlanner. |
Troubleshooting
Problem | Cause | Solution |
---|---|---|
Green column not visible in template | Hidden far to the right | Scroll right until you see highlighted cells |
Import button disabled | Missing required fields | Ensure both Topic/Heading and Test item are filled |
Checklist data not formatted correctly | Wrong template version used | Always use the latest downloaded template |
Users cannot add comments/photos in app | Advanced fields not configured in import | Re-import with correct advanced settings |
Quick facts
- Requires: Project role Manager or higher
- Location: Template → Import from XLSX
- Affects: Checklist library
Updated on: 08/21/2025