Advance import (bulk import) for the [System & test view]

Overview: advanced bulk import in System & Test view


In System & Test view, you can define an asset or equipment type and pre-attach one or more checklists so that new items of that type get those checklists imported automatically, which is used for repeated systems such as VAV boxes, fans, or pumps.


It applies only to System & Test view.


  • Your role must be Manager or higher.
  • You can find the menu at Project settings - Checklists.
  • This changes automatic checklist creation for assets and bulk imports in System & Test view.


Only users with the project role Manager or higher can configure checklist imports.


Requirements for advanced bulk import


Requirement

Description

Project role

Manager or higher

Module

System & Test view only

Import types

Sub-checklists or Checklist items

Spreadsheet IDs

Do not set IDs manually if they already exist in the project


How to configure automatic checklist import


  1. Go to Project settings.
  2. Select the Checklists section.
  3. Choose Sub-checklists or Checklist items.
  4. Define the asset or equipment type and attach the checklists.
  5. Create an asset of that type later to confirm the linked checklists import automatically.


Video guide: advanced bulk import



Results: Sub-checklists vs Checklist items


Sub-checklists


  • Attached checklists appear as child checklists under the asset
  • The asset acts as a folder that contains the sub-checklists


Example for Ventilation:


  • Mechanical complete
  • Functional check
  • System integration test


Screenshot: Advance import bulk import for System & Test view - Example


Checklist items


  • The asset itself is a single checklist
  • Items from the attached checklist or checklists are imported into that checklist


Example: an asset called Ventilation with checklist Ventilation - General inspection receives those inspection items directly.


Screenshot: Advance import bulk import for System & Test view - Example


How to import with the bulk import spreadsheet


  1. Open the bulk import spreadsheet.
  2. Select the checklist type (sub-checklist or checklist items) in the spreadsheet.
  3. Upload the file.


Important: IDs are shared across the project and must not be set manually by the user. If you include IDs that already exist, CxPlanner moves the existing checklist.


Screenshot: Advance import bulk import for System & Test view - Importing with bulk import


Troubleshooting: advanced bulk import


Problem

Cause

Solution

Checklist does not appear on new asset

Asset type is not linked to a checklist

Open Project settings - Checklists and attach the checklist to that type

Wrong checklist structure imported

Wrong import type selected

Change Sub-checklists or Checklist items in project settings and recreate or re-import

Spreadsheet import failed

Incorrect format or missing type selection

Use the bulk import template, set the checklist type column, and retry

Existing checklist moved unexpectedly

Spreadsheet included an ID that already exists

Remove manual IDs from the spreadsheet and re-import