Add a new task / observation
Overview
How do I add a task, issue, deficiency, or observation in a project?
In CxPlanner, tasks are used to document everything from punch list items to general issues and observations. Whether you're tracking deficiencies during commissioning or recording site notes, it all happens through tasks.
When and why to use this
Adding tasks ensures that issues are logged, visible, and resolved through a structured process. In CxPlanner, all task types - whether punch list items, deficiencies, or observations - are grouped under the term Task to keep things simple.
- Use tasks to document issues during site inspections, commissioning, or design reviews.
- Tasks appear across different views: table, kanban, schedule, and floor plans.
- Your ability to see or create tasks depends on your project role and user group.
- Tasks help maintain accountability and generate documentation like punch lists.
Tasks and Observations
CxPlanner is built around tasks. Tasks can be accessed in various views: table, kanban, schedules, and on floor plans - all showing tasks in different ways.
Which tasks you can see depends on your role in the project.
Guide - How to create a new task
- Navigate to the relevant project where you want to add a task and click on Punchlist items & Tasks.
- Click the New Task button.
- Fill out the task details with a title, description, type, due date etc
- Click Save to create the task.
Step 1 & 2
Step 3 & 4
Behavior and results
Once a task is created, it will be visible in various parts of the platform depending on your role and permissions:
- Table view – structured list of all tasks
- Kanban view – visual progress board
- Schedule view – timeline-based task management
- Floor plan view – spatial representation of tasks on drawings
Role-based visibility
Project Role | Can View Tasks | Can Create Tasks |
---|---|---|
Admin | ✅ | ✅ |
Manager | ✅ | ✅ |
Consultant | ✅ | ✅ |
Designer | ✅ | ❌ |
Contractor | ✅ | ❌ |
Viewer | ✅ | ❌ |
Additional restrictions can apply via User Groups with limited view/edit settings.
Troubleshooting
Problem | Cause | Solution |
---|---|---|
Can't see the New Task button | Project role or user group restrictions | Ask a project Admin to review your permissions |
Task not visible in list | User group has limited visibility | Ensure task is assigned to your group or request access |
Task not appearing on floor plan | Floor plan not assigned to task | Edit the task and assign a drawing location |
Quick facts
- Requires: Consultant role or higher
- Location: Project Dashboard → New Task
- Affects: Task views, project dashboards, floor plans, punch list exports
Updated on: 08/07/2025
Thank you!