Articles on: Tasks / Issues

Add a new task / observation

Overview: add a new task


Creating a task in CxPlanner logs a punch list item, issue, or observation so it can be tracked to closeout, which is used during site inspections, commissioning, and design reviews.


For bulk import from a spreadsheet, see Import Tasks from Excel.


  • Your role must be Contractor or higher. Visibility and creation can also depend on your user group.
  • You can find the menu at Punch list items and Tasks - New Task.
  • This creates a task visible in table, Closeout Overview (Kanban), schedule, and floor plan views based on your permissions.


Only users with the project role Contractor or higher can create new tasks. User group settings can further limit visibility or creation.


How to create a new task


  1. Open the project and go to Punch list items and Tasks.
  2. Click New Task.
  3. Fill in the task details such as title, description, type, and due date.
  4. Click Save.


Screenshot: Add a new task / observation - Steps 1 and 2


Screenshot: Add a new task / observation - Steps 3 and 4


Results: add a new task


Project role

Can view tasks

Can create tasks

Admin

Yes

Yes

Manager

Yes

Yes

Consultant

Yes

Yes

Designer

Yes

Yes

Contractor

Yes

Yes

Viewer

Yes

No


  • The task appears in table view as a structured list row
  • Closeout Overview shows it as a Kanban card by status
  • Schedule and floor plan views show it when those links are set


Troubleshooting: add a new task


Problem

Cause

Solution

Cannot see the New Task button

Project role is Viewer, or user group blocks create

Ask a project Admin to raise your role or adjust user group create rights

Task not visible in the list

User group has limited visibility

Assign the task to your group, or ask an Admin for view access

Task not appearing on floor plan

No drawing location on the task

Edit the task and assign a floor plan location